9th Khetwadi Ln, Girgaon, Mumbai, Maharashtra 400004
Room No. 3, Ground Floor, 7th Prabhat Co-op Housing Society, 9th Khetwadi Mumbai-400 004, India
Plot No. 32, Dhruv Logistic Park, Koyna Village, Next To Taloja Midc, Near Vvf Factory, Taloja, Raigad- 402 305, Maharashtra, India
Plot No 284, Daru Khana, Kolsa Bunder, Maharashtra- 400 015, India
Drop Us a Line
Projects | Year | Country | Outer Diameter Min (inches) | Wall Thickness Min (mm) | Outer Diameter Max (inches) | Wall Thickness Max (mm) |
---|---|---|---|---|---|---|
BAPCO MODERNIZATION, BAPCO / TECHNIP | 2019 | BAHRAIN | 6 | 4 | 42 | 52 |
SHOAIBA DESALINATION PLANT, Saline Water Conversion Corporation | 2018 | SAUDI ARABIA | 8 | 22 | 6 | 16 |
GCGV Olefins Recovery Project, GULF COAST GROWTH VENTURES LLC | 2018 | USA | 8 | 54 | 6 | 24 |
AMURSKY GAS PROCESSING, GAZPROM / LINDE | 2017 | RUSSIA | 18 | 56 | 10 | 40 |
VARO PROJECT, VARO Refinery | 2017 | Switzerland | 28 | 44 | 13,22 |
31,85 |
FADHILI, SAUDI ARAMCO / TR / PETROFAC | 2016 - 2017 | SAUDI ARABIA | 8 | 76 | 8 | 43 |
TALARA, PETRO PERU / TECNICAS REUNIDAS | 2016 | PERU | 8 | 60 | 8 | 24 |
JAZAN REFINERY, SAUDI ARAMCO | 2015 | SAUDI ARABIA | 8 | 30 | 8 | 55 |
GULLFAKS V-M, STATOIL | 2014 | NORWAY | 12 | 12 | 6 | 6 |
BAB GAS COMPRESSION PROJECT, ADCO | 2013 | UAE | 6 | 30 | 3 | 40 |
VENEZUELA, FLUOR | 2013 | VENEZUELA | 66 | 66 | 20 | 20 |
KAPODANG GAS DEVELOPMENT PROJECT, TECHNIP | 2013 | MALAYSIA | 8 | 20 | 4 | 38 |
BRUNEI SHELL CHAMPION WATERFLOOD SDSS LP PROJECT, SHELL BRUNEI | 2012 | SOUTH EAST ASIA | 8 | 16 | 12 | 12 |
HABSHAN-5 PROCESS PLANT, GASCO / JGC - TECNIMONT | 2012 | UAE | 10 | 30 | 5 | 30 |
ORYX GTL, QATAR PETROLEUM/SASOL | 2012 | QATAR | 24 | 24 | 14 | 35 |
SUMPAL, CONOCO PHILIPS/PT SEMPEC INDONESIA/ PUNJ LLOYD | 2012 | INDONESIA | 16 | 16 | 10 | 10 |
SONATRACH/TECHNIP FRANCE, ALGIERS REFINERY | 2011 | ALGERIA | 24 | 28 | 15 | 15 |
STATOIL ASA/BP PLC/SONATRACH/ISG, IN SALAH GAS | 2011 | ALGERIA | 8 | 20 | 8 | 20 |
PETROBRAS, P62 | 2011 | BRAZIL | 20 | 20 | 45 | 45 |
FLUXYS / TRACTEBEL, ORV ZEEBRUGGE | 2010 | BELGIUM | 8 | 24 | 4 | 30 |
TECHNIP, BURULLUS | 2010 | EGYPT | 6 | 18 | 11 | 24 |
AKER SOLUTIONS/ENI, GOLIAT SUBSEA | 2010 | NORWAY | 12 | 12 | 20 | 22 |
TECHNIP, PKN ORLEN | 2010 | POLAND | 8 | 82 | 3 | 35 |
SAUDI ARAMCO /JGC, NCP | 2010 | SAUDI ARABIA | 16 | 20 | 5 | 12 |
AKER SOLUTION, OSELVAR | 2010 | NORWAY | 10 | 10 | 32 | 32 |
TRACTEBEL GAS ENGINEERING, SINES LNG TERMINAL | 2010 | PORTUGAL | 26 | 26 | 8 | 8 |
PETROFAC Eng.&Constr., JIHAR STAGE 3 | 2009 | SYRIA | 4 | 8 | 3 | 18 |